GPTPROMPTS.AI
HOW-TO GUIDE · 2026

How to Use Claude for Financial Modeling: 2026 Guide

An 8-step workflow for analysts. Pull numbers from a 10-K in 30 minutes, draft a 3-statement model in 60, layer DCF and LBO valuation in another 60, audit for errors, and write the IC memo, all in a single working session.

Financial modeling with Claude in 2026 is a different category of useful than financial modeling with ChatGPT or Microsoft Copilot in Excel. The difference, again, is the 200K token context window. A typical 10-K filing runs 100,000 to 250,000 tokens; a CIM and supporting deal book run 80,000 to 200,000; a comparable companies set with their last 3 years of financials runs 150,000 to 400,000 across files. Claude can hold the source documents and the analytical context together in one working session and produce both source extractions and downstream model outputs grounded in the actual filings rather than guessed from training data.

The 8-step workflow below is built for production financial modeling work: deal reviews, valuation analyses, IC memos, recurring quarterly updates, board-level scenario analyses. The first three steps are upstream investments (load deal context into a Project, extract numbers from filings, draft model architecture) that compress the next 5-to-10 hours of work into a structured starting point. The middle steps (build in Artifacts, layer in valuation, build scenarios) are how you turn the structured start into a model that holds up under senior review. The final two steps (audit and memo drafting) are what separate a model that ships to investment committee from a model that gets sent back for rework. Every step has Claude-specific patterns that lean on the model's strengths rather than fighting it.

Who this guide is for

  • • Investment banking analysts at bulge bracket, middle market, or boutique firms building 3-statement models, DCFs, comps, and pitchbooks under deadline pressure
  • • Private equity associates running deal reviews, LBO models, and IC memos across 4 to 8 active processes simultaneously
  • • Equity research analysts publishing models and notes on a coverage list of 8 to 20 companies, with quarterly update cycles
  • • Corporate FP&A professionals at mid-market and enterprise companies running annual planning, monthly forecasts, and board materials
  • • Founders and CFOs at growth-stage startups building their own fundraising models, board decks, and operating plans
  • • Hedge fund analysts on long-short equity desks running rapid valuation work across event-driven situations and earnings cycles

Why Claude specifically (vs. ChatGPT, Copilot in Excel, or Gemini)

For financial modeling work, Claude has four specific advantages over alternatives. First, the 200K token context window fits a typical 10-K (100,000 to 250,000 tokens) comfortably and lets Claude hold source documents and analytical context together. ChatGPT's 128K context fits a similar load but Claude's multi-step quantitative reasoning is materially stronger on integrated 3-statement model construction, LBO debt schedule mechanics, and scenario analysis. Second, Projects let you load the deal context, source filings, house assumptions, and templates once and inherit them across every conversation in an engagement; for a recurring deal team or coverage analyst, this is a 5-to-10x productivity multiplier. Third, Artifacts gives you an editable model panel where Claude updates the formulas in place across turns; for a 100-line CSV model, this cuts iteration time by 50 to 70% versus chat-only rebuilds. Fourth, Claude's reasoning on multi-step financial logic is consistently stronger on DCF (especially WACC and terminal value sensitivity), LBO (especially debt schedules with cash sweeps), and accounting treatment edge cases (deferred revenue, leases, stock comp).

Where Claude loses: Microsoft Copilot in Excel wins when you live inside Excel, because cell-aware suggestions and one-click formula completion are faster than copy-pasting from a Claude Artifact. ChatGPT's Code Interpreter is better for one-off analytical scripts and Monte Carlo simulation work where the output is a chart or a distribution rather than an Excel model. Gemini integrates natively with Google Sheets if your firm runs models there. The realistic answer for an investment professional is to use Claude as the primary analytical collaborator (especially for source extraction and model construction) and reach for the environment-native tool for in-cell work.

The 8 steps below are tuned for Claude but the underlying model-building logic translates across tools. The patterns that matter (deal context loading, source extraction, architecture before formulas, four-turn iteration, structured audit) are model-agnostic; the specific UX advantages (Projects, Artifacts, 200K context) are Claude-specific in 2026. For paired workflows, see our Claude full guide, Claude for PDF analysis, and Claude for research.

The 8-Step Workflow

01

Load deal context and source documents into a Claude Project

The single highest-leverage upstream activity is loading the deal context and source documents into a dedicated Claude Project. For a deal review, this typically includes: target company description, last 3 to 5 years of public filings (10-K, 10-Q if recent), recent earnings transcripts, the CIM or pitch deck if applicable, comparable company financials, industry overview documents, your firm's house assumptions (WACC by industry, terminal growth defaults, comparable multiples ranges), and any internal templates for the model and memo. For a public company review, the source documents alone often run 300,000 to 800,000 tokens across multiple files; Claude's per-conversation 200K limit means you load the most-relevant subset for each working session. Save the Project once and inherit context across every conversation. The setup takes 60 to 120 minutes once and pays back inside the first week of an engagement.

Example prompt
In a new Claude Project, upload: (1) target_company_overview.md (1-page description, products, geographies, segments); (2) historical_financials.csv (last 5 years of P&L, balance sheet, cash flow with line-item detail); (3) latest_10k.pdf (most recent annual filing); (4) house_assumptions.md (your firm's standard WACC, terminal growth, comparable multiples ranges by industry); (5) model_template.xlsx structure description (your firm's standard 3-statement template). Then in any new conversation in this Project: 'Using the deal context and source documents in this Project, [task]'. Every Claude response now grounds in the deal materials.
02

Extract numbers and assumptions from source documents

Before building any model, get the numbers out of the source documents. Claude's 200K context window comfortably fits a typical 10-K and most CIMs. Ask for specific extractions in structured tables: revenue by segment for the last 3 to 5 years, operating expenses by category (S&M, R&D, G&A), gross margin trajectory, EBITDA margin trajectory, capex as percent of revenue, working capital metrics (DSO, DPO, DIO), debt schedule (tranches, interest rates, maturities, covenants), share count history with dilution detail, deferred revenue movements, lease liability schedule, restructuring charges and other one-time items. Always ask Claude for source page and section references so you can verify. For a public company, this extraction takes 30 to 60 minutes and produces the assumption-page inputs for the model in a verified, citable format. The investment is meaningful: doing this manually for 10 to 20 comparable companies takes 1 to 2 weeks; with Claude it takes a single afternoon.

Example prompt
'Using the latest_10k.pdf in this Project, extract the following into a structured markdown table with source page references: (1) revenue by segment for FY2023, FY2024, FY2025; (2) gross profit and gross margin by segment; (3) total operating expenses split by S&M, R&D, G&A for the same years; (4) capex by year with split between maintenance and growth where disclosed; (5) working capital balances (AR, inventory, AP) at year-end for each year; (6) debt schedule with tranches, interest rates, maturities; (7) share count history with weighted average diluted; (8) any restructuring charges or one-time items called out as non-recurring. Cite the page number and filing section for every number.'
03

Draft the model architecture before writing any formulas

Skip directly to formulas and you build the wrong model. The discipline: ask Claude to draft the model architecture first (sheet structure, tab names, calculation flow, input vs calculation vs output separation, audit checks, scenario toggles) before any formula work. For a 3-statement model the standard architecture is: Inputs sheet (assumptions and toggles), Historicals sheet (5 years of historical financials), Projections sheet (5 years of projected P&L, balance sheet, cash flow), Schedules sheet (revenue build, working capital, debt, capex, depreciation), Valuation sheet (DCF, comparable companies, comparable transactions), Output sheet (summary tables, charts), Audit sheet (balance check, cash check, integrity tests). Claude proposes the architecture, you approve or adjust, then build sequentially. The architecture step takes 15 to 30 minutes and prevents the 4-to-8 hour rebuild that follows when you discover the architecture is wrong halfway through.

Example prompt
'Using the deal context in this Project, propose the architecture for a 3-statement model with integrated DCF and comparable company valuation. Audience: investment committee at a mid-market PE firm. Use period: 5 years historical, 5 years projected. Required outputs: revenue trajectory, EBITDA margin path, unlevered free cash flow, DCF valuation with WACC and terminal value sensitivity, comparable company valuation range, IRR and MOIC at multiple exit scenarios, sensitivity table for the deal recommendation. Output: (1) sheet/tab structure with names and purpose; (2) calculation flow diagram (which sheets feed which); (3) inputs vs calculations vs outputs separation; (4) audit checks list; (5) scenario toggle structure. Format suitable for a senior associate to use as the build spec.'
04

Build the projection model in Artifacts and iterate against historicals

For the actual model build, work in Claude Artifacts so you can iterate on the formulas in place across multiple turns. Build sequentially: revenue model (driver-based, with explicit assumptions for unit volume and price), cost of goods sold and gross margin, operating expenses by category, EBITDA, depreciation and amortization (linking to fixed asset schedule), interest expense (linking to debt schedule), tax expense, net income; then balance sheet items that link from the P&L; then cash flow statement that derives from P&L and balance sheet changes. After each section, paste the historical values back to Claude and verify: do the projection ratios match the historical trends? Are growth rates consistent with management guidance and your house assumptions? Does anything look off vs the comparable companies? Iterate inside the Artifact until the projections pass the smell test, then export to Excel for the actual model.

Example prompt
'Build the projection model in an Artifact. Format: CSV with formulas as text strings (=B5*1.05). Output years: FY2026E, FY2027E, FY2028E, FY2029E, FY2030E. Use the historical financials from the source extraction in step 2 as the base year. Driver-based revenue model: split into [segment 1] and [segment 2], with explicit unit volume and price assumptions per segment per year. Operating expenses as percent of revenue with a glide path to mature levels. Capex schedule based on maintenance percent + growth percent of revenue. Working capital based on DSO, DPO, DIO targets. Depreciation linking to capex schedule on a 7-year straight line. After the build, paste historical actuals next to projection year 1 and check the implied growth rates and ratios for reasonability. Flag anything that looks off vs historical trend.'
05

Add the DCF and comparable company valuation

Once the projection model is built and tied out, layer in the valuation work. For DCF: ask Claude to calculate unlevered free cash flow per year (EBIT * (1 - tax rate) + D&A - capex - change in working capital), discount each year at WACC, calculate terminal value using both Gordon growth and exit multiple methods, sum to enterprise value, bridge to equity value (subtract debt, add cash, subtract non-controlling interests), divide by diluted shares. Build a sensitivity table across WACC (8% to 14%) and terminal growth (1% to 4%) or exit multiple (8x to 14x EBITDA). For comparable company valuation: paste the comparable set with their current trading multiples, ask Claude to apply the median or mean multiple to the target's NTM EBITDA, revenue, or earnings, and present a valuation range. Compare DCF to comps and triangulate to a recommended valuation range with rationale. The valuation work in Artifacts takes 30 to 60 minutes for a clean public company.

Example prompt
'Add the valuation analysis to the Artifact. (1) DCF: calculate unlevered free cash flow per year using EBIT * (1 - tax rate) + D&A - capex - change in working capital. Use a 25% effective tax rate. Discount at WACC of [X]% (state assumption). Terminal value via both Gordon growth (perpetual growth = 2.5%) and exit multiple (10x EBITDA). Sum to EV, bridge to equity (subtract net debt of [X], adjust for [Y]), divide by diluted shares of [Z]. (2) Sensitivity: 2-variable table for equity value per share across WACC (8%, 10%, 12%, 14%) and terminal growth (1%, 2%, 3%, 4%). (3) Comparable companies: apply the median NTM EBITDA multiple from this comparable set [paste] to the target NTM EBITDA. State the implied valuation range. (4) Triangulate to a recommended valuation range with 2-paragraph rationale.'
06

Build scenario analysis and stress test the model

A model with one scenario is a forecast pretending to be analysis. Ask Claude to build base, upside, and downside scenarios with explicit assumption deltas (e.g., revenue growth: base 12%, upside 18%, downside 5%; gross margin: base 45%, upside 48%, downside 41%; etc.). For each scenario, present the resulting outputs: revenue trajectory, EBITDA margin path, unlevered free cash flow, valuation range, IRR and MOIC if a deal context. Then stress test: what is the break-even assumption that takes IRR below 15%? What level of revenue growth keeps the company within debt covenants? What does the model look like in a recession scenario (negative growth year, margin compression, working capital strain)? The stress tests surface the assumptions that the deal hinges on; senior partners will ask about these in committee.

Example prompt
'Add scenario analysis to the Artifact. Three scenarios: base, upside, downside. Assumption deltas: revenue growth [base 12% / upside 18% / downside 5%], gross margin [base 45% / upside 48% / downside 41%], opex as percent of revenue [base 30% / upside 27% / downside 33%], capex as percent of revenue [base 5% / upside 4.5% / downside 6%]. For each scenario, output: (1) FY2030 revenue and EBITDA; (2) cumulative unlevered FCF over the projection; (3) DCF equity value range; (4) IRR and MOIC at exit assuming sale in FY2030 at base case exit multiple. Then run two stress tests: (A) what revenue growth rate takes IRR below 15%; (B) what gross margin level breaches the senior debt covenant of 4.5x net leverage. Output as comparison tables.'
07

Audit the model for errors, hardcodes, and broken links

Before any model goes to a senior reviewer or investment committee, run a structured audit pass with Claude. Paste the model in formula-view and ask Claude to: (1) flag every hardcoded value in calculation cells (anything that should be assumption-driven), (2) identify formulas that reference cells outside the expected range or sheet (potential broken links), (3) check for circular references (other than intentional iteration loops like interest expense), (4) verify the balance sheet balances every period, (5) verify cash on the balance sheet matches the cash flow statement ending balance, (6) check that the historical period reconciles to the source filings within rounding, (7) flag formula inconsistencies across columns (e.g., column G uses =F5*1.05 but column H uses =G5*0.97 with no rationale), (8) sanity check assumption reasonability (gross margin trajectory, capex as percent of revenue, WC days). The audit takes 15 to 30 minutes and catches 60 to 90% of the errors a human reviewer would find.

Example prompt
'Audit the model in the Artifact for errors. Paste in formula view: [paste]. Flag: (1) every hardcoded value in a calculation cell (should be assumption-driven); (2) formulas referencing cells outside expected ranges (potential broken links); (3) circular references other than intentional interest expense iteration; (4) periods where balance sheet does not balance; (5) cash flow statement ending balance vs balance sheet cash; (6) historical period reconciliation to source 10-K (any variance >0.5%); (7) formula inconsistencies across columns within a single row; (8) assumption reasonability flags (gross margin, capex %, WC days vs industry norms). Output: (A) high-severity issues that block sign-off; (B) medium-severity issues that should be fixed pre-IC; (C) low-severity polish items. For each, cite the cell and propose a fix.'
08

Draft the investment memo and committee materials from the model output

Once the model is reviewed and tied out, ask Claude to draft the investment memo and committee materials from the model outputs. The pattern: paste key model outputs (revenue trajectory, EBITDA margin path, FCF profile, valuation range, IRR and MOIC across scenarios, sensitivity tables, key assumptions) plus the deal context and your firm's memo template structure. Claude produces a draft memo that captures the analysis correctly: executive summary, business overview, market and competitive position, financial performance and projections, valuation analysis, returns analysis, key risks, recommendation. You then layer in the qualitative judgment, market color, and proprietary insight that make it your firm's view rather than a generic write-up. For a 10-to-15 page memo, Claude saves 4 to 8 hours of writing time and produces a more structured starting point than a blank page. The memo edit pass takes 2 to 4 hours and is non-negotiable; the qualitative judgment is what the IC is paying for, not the model.

Example prompt
'Draft a 10-page investment memo for the IC using the model outputs in the Artifact and the deal context in this Project. Memo structure (per our firm template): (1) Executive summary (1 page); (2) Business overview (1 page); (3) Market and competitive position (2 pages); (4) Financial performance and projections (2 pages); (5) Valuation analysis (1 page); (6) Returns analysis with sensitivity (1 page); (7) Key risks and mitigants (1 page); (8) Recommendation (1 page). For each section, pull the relevant numbers from the model, cite specific values, and flag any assumption I should review before sign-off. Tone: senior associate writing for a 4-person IC. Do not invent qualitative claims I have not provided; flag where I need to add color.'

Common Mistakes That Break Claude Financial Models

1. Building the model in chat output without exporting to a real environment

The model in chat looks right but has not been computed. Cells with circular references, broken links, or formula errors do not surface until you actually run the math in Excel or Python. Always paste Claude output into a real spreadsheet, verify totals tie, and check the balance sheet balances every period.

2. Skipping the source extraction step and letting Claude estimate numbers

Claude will produce plausible-looking numbers from training data when you do not provide source documents. For any number that drives a material conclusion, paste the source, ask Claude to extract with citations, and verify the citations against the document. Numbers without traceable sources are how models silently drift from reality.

3. Going straight to formulas without drafting the architecture

Skip directly to formulas and you build the wrong model. The architecture step (sheet structure, calculation flow, input vs calculation vs output separation, audit checks) takes 15 to 30 minutes and prevents the 4-to-8 hour rebuild that follows when you discover the architecture is wrong halfway through.

4. Trusting Claude on accounting treatments without naming the standard

Modern accounting (revenue recognition, leases, derivatives, hedge accounting) has too many edge cases for Claude to handle correctly without explicit standard references (ASC 606, ASC 842, ASC 815, ASC 718). Always name the standard and ask Claude to walk through the treatment step by step before writing the journal entries or model adjustments.

5. Confusing levered and unlevered cash flow in DCF

The most common Claude error in DCF construction. Always declare which you want explicitly: unlevered FCF for enterprise value calculation (EBIT * (1 - tax) + D&A - capex - WC change) discounted at WACC, or levered FCF for equity value (Net Income + D&A - capex - WC change - mandatory debt repayment) discounted at cost of equity.

6. Building one scenario and calling it analysis

A model with one scenario is a forecast pretending to be analysis. Always build base, upside, downside with explicit assumption deltas and run stress tests on the assumptions the deal hinges on. Senior partners and IC members will ask about these; have them ready.

7. Skipping the audit pass before senior review

A 15 to 30 minute structured audit pass with Claude catches 60 to 90% of the errors a human reviewer would find in an hour. Hardcoded values, broken links, balance sheet imbalances, cash flow ties, formula inconsistencies. Treating the audit as optional is how junior analysts get sent back for rework.

8. Letting Claude write the qualitative judgment in the IC memo

Claude drafts the structure and the analytical narrative around the numbers. The qualitative judgment (why this deal, why now, what could go wrong, what your firm uniquely sees) is what the IC is paying for. Add it yourself; do not let Claude invent qualitative claims you have not provided.

Pro Tips (What Most Analysts Miss)

Build a separate Claude Project per active deal. Loading deal-specific context per Project (target overview, filings, comparables, house assumptions, templates) prevents cross-deal contamination and lets you reach for the right context fast. For a coverage analyst, build one Project per company.

Paste your firm's house assumptions into every Project. WACC by industry, terminal growth defaults, comparable multiples ranges, hold period assumptions for PE, your firm's preferred valuation methods. Claude inherits the conventions and produces work that matches your firm's standards from the first turn.

Use Opus 4.6 for the model build; Sonnet 4.6 for the recurring updates. Opus is materially better on integrated 3-statement construction and LBO mechanics. Sonnet is faster and roughly 90% as accurate for daily work like quarterly model updates and earnings note revisions.

Always ask Claude to cite source pages for extracted numbers. Source citations are the difference between a defensible model and a model that falls apart in IC. The 30 seconds Claude spends adding citations saves hours of re-verification when a partner asks where a number came from.

For LBO models, build the debt schedule in a separate Artifact before the integrated model. Debt schedule with cash sweep priority is the trickiest part of LBO mechanics. Build it as a standalone Artifact, verify the cash flows tie, then link it into the main 3-statement model. Building it inline with the integrated model produces bugs that are hard to find later.

Run the audit pass twice: once after the model build, once before sending to senior review. The two-pass audit catches issues introduced during the second build phase (valuation layer, scenarios) that the first audit could not have caught. Total time: 30 to 45 minutes; saves 2 to 4 hours of rework.

For investment memos, draft from model outputs, then edit aggressively for voice. Claude produces a structured starting point that captures the analysis correctly. The editing pass (2 to 4 hours) is where you add the qualitative judgment, market color, and proprietary insight. The memo is your firm's view; treat the Claude draft as scaffolding.

For quarterly updates on existing models, use Sonnet 4.6 with the prior quarter Artifact loaded. Claude updates the historical column and refreshes the projections based on management commentary in 15 to 30 minutes versus 1 to 2 hours from scratch. The recurring update workflow is where Claude pays for itself fastest in a coverage analyst's day.

Claude Financial Modeling Prompt Library (Copy-Paste)

25 production-tested prompts organized by financial modeling task. Replace bracketed variables with your specifics. Always run prompts inside a Claude Project with the deal context and source documents loaded.

Source extraction from 10-K, S-1, CIM

'Using the latest_10k.pdf in this Project, extract the following into a structured markdown table with source page references: (1) revenue by segment for FY2023, FY2024, FY2025; (2) gross profit and gross margin by segment; (3) operating expenses split by S&M, R&D, G&A; (4) capex with maintenance vs growth split where disclosed; (5) working capital balances at year-end; (6) debt schedule with tranches, interest rates, maturities; (7) share count history with weighted average diluted; (8) restructuring or one-time items called out as non-recurring. Cite page number and section for every number.'
'Using the proxy_statement.pdf in this Project, extract: (1) executive compensation summary for top 5 NEOs over the last 3 years (base, bonus, equity, total); (2) equity grant details (option grants, RSU grants, performance shares); (3) any change of control provisions and trigger amounts; (4) related party transactions; (5) governance details relevant to a buyout (poison pill, classified board, voting agreements). Cite page references.'
'From the CIM in this Project, extract: (1) historical financials with adjustments to EBITDA called out separately; (2) revenue build by customer cohort or segment; (3) management projections for the next 5 years with the assumptions called out; (4) growth investment plans and capex requirements; (5) working capital seasonality patterns; (6) any one-time items the management has flagged. Output as markdown tables. Flag any numbers that look aggressive or inconsistent with the historical trend.'

3-statement model construction

'Build the 3-statement model in an Artifact. Format: CSV with formulas as text strings. Output years: FY2026E through FY2030E. Use historical financials from the source extraction as the base. Driver-based revenue: split into [segment 1] and [segment 2] with explicit unit volume and price per segment per year. Operating expenses as percent of revenue with glide path. Capex schedule based on maintenance + growth percent. Working capital based on DSO/DPO/DIO targets. Depreciation on 7-year straight line linked to capex. Tax at 25%. Balance sheet links from P&L; cash flow derives from P&L and balance sheet changes. Audit row: balance sheet balance check.'
'Add the integrated cash flow statement to the model in the Artifact. Indirect method: start with Net Income, add back D&A, subtract changes in working capital (AR, inventory, AP), arrive at CFO. Investing: subtract capex, add proceeds from any divestitures. Financing: subtract debt amortization, subtract dividends, add new debt issuance. Verify ending cash on cash flow ties to ending cash on balance sheet for every year.'

DCF and valuation

'Add DCF analysis to the Artifact. (1) Calculate unlevered FCF per year: EBIT * (1 - tax rate) + D&A - capex - change in working capital. Use 25% effective tax rate. (2) Discount at WACC of 10% (state assumption inputs: cost of debt after-tax, cost of equity via CAPM with risk-free 4.2%, beta [X], equity risk premium 5.5%, target capital structure D/V 30%). (3) Terminal value via both Gordon growth (2.5%) and exit multiple (10x EBITDA). (4) Sum to enterprise value, bridge to equity (subtract net debt of [X], add cash of [Y]), divide by diluted shares. (5) Sensitivity table: equity value per share across WACC (8%, 10%, 12%) and terminal growth (1%, 2%, 3%, 4%).'
'Add comparable companies valuation to the Artifact. Comparable set: [paste tickers and last-12-month metrics]. (1) Calculate trading multiples for each comp (EV/Revenue, EV/EBITDA, P/E for NTM and LTM). (2) Identify median, mean, 25th percentile, 75th percentile of each multiple. (3) Apply median NTM EV/EBITDA to target NTM EBITDA. (4) State implied valuation range and triangulate to a recommended range vs DCF. (5) Flag any comp that should be excluded as not truly comparable and explain why.'

LBO modeling

'Build the LBO debt schedule in a standalone Artifact before integrating into the main model. Sources and uses: target equity check $[X], senior debt $[Y] at SOFR + 400bps amortizing 1% annual, mezzanine $[Z] at 11% PIK, sponsor equity $[W]. 5-year hold. Build: (1) opening balance sheet adjustments; (2) debt schedule with interest expense and amortization per tranche; (3) cash sweep priority: first to senior debt amortization above mandatory, then to mezz; (4) ending debt balance per tranche per year. Verify cash flows tie to mandatory amortization plus sweeps.'
'Add returns analysis to the LBO model. (1) Exit assumption: sale at end of Year 5 at 10x trailing EBITDA. (2) Bridge from exit EV to equity proceeds: subtract ending debt, add ending cash. (3) Calculate MOIC: equity proceeds / sponsor equity check. (4) Calculate IRR with annual cash flows (negative initial check, no interim distributions, positive exit proceeds). (5) Sensitivity table: IRR across exit multiple (8x, 10x, 12x EBITDA) and revenue growth (5%, 10%, 15% CAGR). (6) Identify the breakeven exit multiple at which IRR = 20%.'

Scenario and sensitivity analysis

'Add scenario analysis to the Artifact. Three scenarios: base, upside, downside. Assumption deltas: revenue growth [12% / 18% / 5%], gross margin [45% / 48% / 41%], opex % revenue [30% / 27% / 33%], capex % revenue [5% / 4.5% / 6%]. For each scenario output: FY2030 revenue and EBITDA, cumulative unlevered FCF, DCF equity value range, IRR and MOIC at base case exit. Then run two stress tests: (A) revenue growth that takes IRR below 15%; (B) gross margin that breaches the senior debt covenant of 4.5x net leverage.'
'Build a Monte Carlo simulation in Python (numpy + pandas) for the DCF in the Artifact. 10,000 iterations. Distributions: revenue growth normal(12%, 4%), gross margin normal(45%, 3%), WACC normal(10%, 1.5%), terminal growth normal(2.5%, 0.5%). Output: distribution of equity value per share with mean, median, 5th/25th/75th/95th percentiles. Probability that the implied per-share value exceeds the current market price of $[X]. Generate the script with comments and a sample output summary.'

Audit and integrity checks

'Audit the model in the Artifact for errors. Paste in formula view: [paste]. Flag: (1) hardcoded values in calculation cells; (2) formulas referencing cells outside expected ranges; (3) circular references other than intentional interest expense iteration; (4) periods where balance sheet does not balance; (5) cash flow ending balance vs balance sheet cash; (6) historical reconciliation to source 10-K (variance >0.5%); (7) formula inconsistencies across columns within a row; (8) assumption reasonability flags. Output: high/medium/low severity with cell references and proposed fixes.'
'Run an integrity check on the model in the Artifact: (1) does revenue tie from segment build to income statement; (2) does gross profit math equal revenue minus COGS; (3) does EBITDA tie between income statement and cash flow statement; (4) does net income from income statement equal net income on cash flow statement starting line; (5) does capex on cash flow statement tie to fixed asset schedule; (6) does debt amortization on cash flow tie to debt schedule. List any breaks with cell references.'

Investment memo and committee materials

'Draft a 10-page IC memo using the model outputs in the Artifact and deal context in this Project. Structure: (1) Executive summary; (2) Business overview; (3) Market and competitive position; (4) Financial performance and projections; (5) Valuation analysis; (6) Returns analysis with sensitivity; (7) Key risks and mitigants; (8) Recommendation. Pull specific numbers from the model. Tone: senior associate writing for a 4-person IC. Flag where I need to add qualitative color rather than inventing claims.'
'Draft a 1-page tearsheet for the deal: (1) target overview (3 lines); (2) deal economics (entry multiple, equity check, debt/EBITDA, expected hold period); (3) base case returns (MOIC, IRR); (4) upside/downside returns range; (5) top 3 investment merits; (6) top 3 risks. Format for a single 8.5x11 page in landscape. Pull all numbers from the model in the Artifact.'

Quarterly model updates

'Update the model in this Artifact for the most recent quarter. Replace the historical projections column with actuals from the latest 10-Q [paste financials]. Reconcile management commentary against my prior projections; flag where actuals differed from my forecast by more than 5%. Update the projection periods to reflect any guidance changes from the earnings call [paste call transcript or summary]. Re-run the DCF and update the recommendation. Output: (1) updated model in Artifact; (2) 1-page summary of what changed and why; (3) revised price target with rationale.'

Want more Claude prompts for analytical workflows? See our how to use Claude (full guide), Claude for PDF analysis, Claude for research, and Claude for SQL queries. For comparable financial workflows on other tools, see ChatGPT for financial analysis and Microsoft Copilot in Excel.

Frequently Asked Questions

Related Guides

Don't stop here

What to read next

Hand-picked guides our readers explore right after this one.